EXTEND TOOL LIFE. ELIMINATE DOWNTIME.

Integrity USA provides preventive maintenance and precision repairs that extend tool life, minimize downtime, and protect your investment—so your production stays efficient, consistent, and on schedule.

Are Your Molds Failing You?

  • Degraded Cooling

  • Poor Part Quality & Appearance

  • Flow Lines

  • Burning Marks

  • Sink Marks

  • Warping

Replacement tooling is not always an option; optimization and refurbishment may be within budget when strategic repairs can restore performance quickly and affordably. Our injection mold repair process is designed to maximize lifespan while minimizing downtime and quality issues.

Why Repair Instead of Replace?

✔️ Efficient Investment: Extending the life of a tool can deliver the performance you need without the investment of a new build.

✔️ Less Downtime: Proper Maintenance & Repairs can be completed quickly, minimizing disruption to production schedules.

✔️ Sustainability: Repairing molds reduces waste & scrap and maximizes the value of your existing assets and ROI.

✔️ Local Support: With Integrity USA’s central U.S. location, responsive repair and maintenance services are always within reach.

When a new build is the best long-term solution, we’ll tell you. When a repair makes sense, we’ll deliver it with the same precision and quality.

Industries We Serve

  • Recreational Vehicles

  • Automotive

  • Consumer Products

  • Farming & Agriculture

  • Packaging

Let’s Build Something You Can Count On

One way, the best way, the Integrity way.

From injection mold making to final part delivery, your long-term partner for quality, speed, and support.